With the project coming from a recommendation from a local architect, OPRA Projects partnered with Rezen Studio to work with PTTEP on a high-end design for their new office. Under the Design and Construct engagement, OPRA were able to accelerate the overall delivery with some design elements being finalised during construction.
The project was typical fit-out works in conjunction with some works required by the building owner, involving demolition, partitions, glazing, doors, ceilings, joinery, painting, tiling, workstations and furniture.
OPRA engaged our trusted subcontractor group to complete the services consultation.
With the works being complete on an occupied floor – with buildings owners, Charter Hall an adjoining tenant – commitment to business continuity was critical.